One of the UK’s leading drainage and wastewater specialists is promising to transform the rehabilitation of vertical drainage stacks in high-rise buildings with a revolutionary LED pipe lining system.
Lanes Group plc has proven it can significantly speed up the previously difficult process of lining both rainwater and foul stack pipes, with less disruption, using far less energy and creating less material waste.
The company has become the first contractor in the UK to line tall building drain stacks using the Brawo Magnavity LED light cured in place pipe (CIPP) system supplied by trenchless technology specialist S1E.
The system makes lining drains in high-rise buildings much easier and more sustainable, just at a time when problems caused by faulty drainage systems are becoming a maintenance priority for social housing landlords.
Lanes is lining stacks on high-rise blocks of flats for a main contractor working for a West Midlands council. The results have been so successful that more blocks are being added to the programme.
The Brawo Magnavity system uses LED light to cure the resin. Its LED light array is combined with a powerful electric magnet that holds the lights in place as the liner is inverted into the pipe with compressed air.
Once the liner is in place, the light pack, with its 96 UV LED lights, detaches from the magnet and cures the resin at a speed of up to 0.6 meters a minute as it is pulled back through the pipe.
Lanes is able to install and cure each of the 47-metre-long stack liners for its West Midland client in around two hours.
T 0800 526488